NATIONAL OFFICE POTENTIAL INCIDENT OF NONCOMPLIANCE (PINC) LIST
-i-
PREFACE
The Safety and Enforcement Branch of the Engineering and Operations Division wish to extend our appreciation to all participating MMS personnel for their dedicated effort and expertise in developing this edition of the National Office PINC List. Revisions to the National Office PINC List The following format is presented as a means for MMS personnel to suggest revisions to the National Office PINC List. All suggested revisions will be reviewed by the Office PINC Team. Before revisions are included in the National Office PINC List they will be routed to the Headquarters Division Chiefs and the Regional Directors, or their staff, for review and comment. Please submit suggested revisions directly to: Minerals Management Service Office PINC Team Safety and Enforcement Branch Mail Stop 4023 381 Elden Street Herndon, Virginia 20170 Suggested Revision Format: PINC Number: PINC Statement: Authority: Enforcement Action: Rationale/Note: Definition: Inspection Procedure: If Noncompliance Exists: Please be advised: The guidelines in this document are to be considered the most preferable way of implementing the inspection and enforcement of each Office PINC and not intended as a directive or to supersede the regulatory language of the Code of Federal Regulations. Also, the enforcement status of a Facility Shut-in (S) INC or a Component Shut-in (C) INC may not necessarily require the full extent of the enforcement specified. The issuing office has full authority to use their discretion when issuing a Component Shut-in (C) INC. However, when issuing a Facility Shut-in INC the issuing office must solicit approval from the Associate Director for Offshore Minerals Management prior to the actual shut-in of a facility. The only exception to this requirement is when there is an imminent danger to personnel, property, or the environment, exacting a more immediate MMS response.
-ii-
DESCRIPTION OF THE GUIDELINES FOR THE NATIONAL OFFICE PINC LIST
- tlsf1008pdf > (Platform/Rig/Operation)
-
(Platform/Rig/Operation)
下载该文档 文档格式:PDF 更新时间:2007-02-01 下载次数:0 点击次数:6文档基本属性 文档语言: Simplified Chinese 文档格式: pdf 文档作者: 微软用户 关键词: 主题: 备注: 点击这里显示更多文档属性 经理: 单位: 微软中国 分类: 创建时间: 上次保存者: 修订次数: 编辑时间: 文档创建者: 修订: 加密标识: 幻灯片: 段落数: 字节数: 备注: 演示格式: 上次保存时间:
- 下载地址 (推荐使用迅雷下载地址,速度快,支持断点续传)
- PDF格式下载
- 更多文档...
-
上一篇:http://www.chuandong.com/uploadsoft/2006/12/20061223114517631...
下一篇:Inter-professional
点击查看更多关于tlsf1008pdf的相关文档
- 您可能感兴趣的
- tlsf1008 tplinktlsf1008 tlsf1008怎么用 tlsf1008设置 tlsf1008怎么设置 交换机tlsf1008 tlsf1008密码 tlsf1008用户手册 tlsg1008 sf1008
- 大家在找
-
- · 武警新兵队列训练
- · 28孔口琴音阶图
- · 武林风之一龙对王洪祥
- · 怎样把flash转化成gif
- · 磨铁中文网盗墓笔记
- · rj45网络接口电路设计
- · 关于卫校学生带教方面的文章
- · 现代企业经营管理试卷
- · 房地产开发经营业务
- · 无锡人才网兼职
- · 伯努利方程习题
- · 常州屏蔽室
- · 二层80平方米设计图
- · 153后桥速比
- · 耳朵上的痣命运图解
- · 钳工接技术论文
- · catphysics48
- · 5800w诺基亚报价行货
- · 经济管理学论文本科
- · android4.0sdk
- · 园林景观设计招聘
- · flash动画素材下载
- · dlink路由器524m设置
- · 无忧中职网
- · 东莞塑胶制品厂
- · 电机转速测控系统设计
- · 录入排版纳啥税
- · 河北省新农合定点医院
- · 技嘉880g配显卡
- · 企事业单位
- 赞助商链接